JIUQUAN, April 23 (Xinhua) -- The Shenzhou-18 crewed space mission completed its last joint practice before launch and the system-wide airtightness check on Tuesday.
The rocket and spacecraft have completed the electrical performance test, and the astronauts and all systems at the launch site have carried out the launch drill, 海晏县卫理坚果有限公司 with everything reported to be in good condition.
六安市新雅广告装饰有限公司April is typically the windiest and sandiest month at the Jiuquan Satellite Launch Center in northwest China. The meteorological staff at the launch site have analyzed April's wind speed data over the past 10 years and mapped out multiple contingency response plans.
The combination of the Shenzhou-18 crewed spaceship and a Long March-2F carrier rocket has been transferred to the launching area,中基宁波集团股份有限公司溜冰 the China Manned Space Agency (CMSA) said on April 17.
沙河市利公棉类有限公司The spaceship will be launched in the coming days溜冰, 赤坎区静电锁具有限公司 the CMSA said. ■